News water@logisticon.com +31(0)184 608260
Successful Pilot for Cooling Tower Blowdown Treatment in the Chemical Industry

Successful Pilot for Cooling Tower Blowdown Treatment in the Chemical Industry

Logisticon Water Treatment has successfully completed an innovative pilot project in the chemical industry for the treatment of cooling tower blowdown.

The Challenge: No Direct Discharge of Cooling Tower Blowdown

The key challenge in this project was that the cooling tower blowdown could not be discharged directly to the central wastewater treatment plant on the industrial site. Before discharge, the added cooling water treatment chemicals had to be effectively removed from the water stream.

The Solution: Membrane Barrier and Polishing Filtration

Following a thorough evaluation of various treatment options, the technology proposed by Logisticon was selected for practical testing. This marked an important step toward a controlled, safe, and compliant treatment process for this complex water stream.

The developed solution consisted of a combination of a membrane barrier and a dedicated polishing filtration system.

Key Benefits at a Glance

  1. Highly effective in significantly reducing the concentration of cooling water treatment chemicals, in many cases to below detectable limits.
  2. Due to this substantial reduction, the treated water streams became viable candidates for water reuse.
  3. The solution makes a clear contribution to sustainable water management within industrial processes.

The pilot was completed successfully and confirmed the potential of this technology for applications where strict requirements apply to wastewater discharge and the removal of cooling water additives. The solution is fully automated and highly scalable, making it suitable for widespread deployment in similar industrial environments.

The results have already attracted interest from several organizations within the sector, which are currently exploring opportunities to implement this approach.

MAKING WATER WORK

Sales. Rental. Service.

KEEP UP TO DATE

Sign up for the online newsletter and keep up to date with the latest developments and the water treatment projects of Logisticon Water Treatment.

More news
Project in the Spotlight: Future-Ready Wastewater Treatment for a Cheese Manufacturer
During the expansion of a production site near Sint Jansteen, one key question took centre stage: how can we ensure reliable and efficient wastewater treatment that meets today’s needs while also being ready for future growth?
Read more
A little something different form work!
The best ideas often come to life in between projects. That’s exactly how this staff initiative came about: the Tour D’Logisticon, and what a great experience it was!
Read more
The Water Framework Directive deadline is approaching
The deadline for the European Water Framework Directive (WFD) is getting closer.
Read more
MAKING WATER WORK
Sales. Rental. Service.